Transportable pressure vessels for high-pressure gases are routinely inspected and tested as part of the manufacturing process. They are generally marked as evidence of passing the tests, either individually or as part of a batch (some tests are destructive), and certified as meeting the standard of manufacture by the authorised testing agency, making them legal for import and sale. When a cylinder is manufactured, its specification, including ''manufacturer'', ''working pressure'', ''test pressure'', ''date of manufacture'', ''capacity'' and ''weight'' are stamped on the cylinder. Most countries require diving cylinders to be checked on a regular basis. This usually consists of an internal
visual inspection Visual inspection is a common method of quality control, data acquisition, and data analysis. Visual Inspection, used in maintenance of facilities, mean inspection of equipment and structures using either or all of raw human senses such as vision, ...
and a hydrostatic test. The inspection and testing requirements for scuba cylinders may be very different from the requirements for other compressed gas containers due to the more corrosive environment in which they are used. After a cylinder passes the test, the test date, (or the test expiry date in some countries such as
Germany Germany,, officially the Federal Republic of Germany, is a country in Central Europe. It is the second most populous country in Europe after Russia, and the most populous member state of the European Union. Germany is situated betwee ...
), is punched into the shoulder of the cylinder for easy verification at fill time.This is a European requirement. The international standard for the stamp format is ''ISO 13769, Gas cylinders - Stamp marking''. A hydrostatic test involves pressurising the cylinder to its test pressure (usually 5/3 or 3/2 of the working pressure) and measuring its volume before and after the test. A permanent increase in volume above the tolerated level means the cylinder fails the test and must be permanently removed from service. An inspection may include external and internal inspection for damage, corrosion, and correct colour and markings. The failure criteria vary according to the published standards of the relevant authority, but may include inspection for bulges, overheating, dents, gouges, electrical arc scars, pitting, line corrosion, general corrosion, cracks, thread damage, defacing of permanent markings, and colour coding. Gas filling operators may be required to check the cylinder markings and perform an external visual inspection before filling the cylinder and may refuse to fill non-standard or out-of-test cylinders.This is a European requirement, a requirement of the US DOT, and a South African requirement.


Quality assurance during manufacture

Standard seamless high pressure aluminium cylinders do not have a limited life. They may be used until they fail test or inspection. Three cylinders from each batch are pulsation hydrostatically tested for 10,000 cycles from 0 to test pressure at 12 cycles per minute. An alternative test approved by the US Department of Transportation is 100,000 cycles from 0 to working pressure. For the batch to pass, there must be no leaks or failures. Bursting pressure when new is about 2.5 times working pressure.


Intervals between inspections and tests

A cylinder is due to be inspected and tested at the first time it is to be filled after the expiry of the interval as specified by the United Nations ''Recommendations on the Transport of Dangerous Goods, Model Regulations'', or as specified by national or international standards applicable in the region of use. *In the
United States The United States of America (U.S.A. or USA), commonly known as the United States (U.S. or US) or America, is a country Continental United States, primarily located in North America. It consists of 50 U.S. state, states, a Washington, D.C., ...
, an annual visual inspection is not required by the USA DOT, though they do require a hydrostatic test every five years. The visual inspection requirement is a diving industry standard based on observations made during a review by the National Underwater Accident Data Center. *In
European Union The European Union (EU) is a supranational union, supranational political union, political and economic union of Member state of the European Union, member states that are located primarily in Europe, Europe. The union has a total area of ...
countries a visual inspection is required every 2.5 years, and a hydrostatic test every five years. *In
Norway Norway, officially the Kingdom of Norway, is a Nordic countries, Nordic country in Northern Europe, the mainland territory of which comprises the western and northernmost portion of the Scandinavian Peninsula. The remote Arctic island of ...
a hydrostatic test (including a visual inspection) is required 3 years after production date, then every 2 years. *In
Australia Australia, officially the Commonwealth of Australia, is a sovereign country comprising the mainland of the Australian continent, the island of Tasmania, and numerous smaller islands. With an area of , Australia is the largest country by ...
the applicable Australian Standards require that cylinders are hydrostatically tested every twelve months. *In
South Africa South Africa, officially the Republic of South Africa (RSA), is the southernmost country in Africa. It is bounded to the south by of coastline that stretch along the South Atlantic and Indian Oceans; to the north by the neighbouring coun ...
a hydrostatic test is required every 4 years, and visual inspection every year. Eddy current testing of neck threads must be done according to the manufacturer's recommendations.


Procedures for periodic inspections and tests

If a cylinder passes the listed procedures, but the condition remains doubtful, further tests can be applied to ensure that the cylinder is fit for use. Cylinders that fail the tests or inspection and cannot be fixed should be rendered unserviceable after notifying the owner of the reason for failure.


Identification of cylinder and preparation for testing

Before starting work the cylinder must be identified from the labelling and permanent stamp markings, and the ownership and contents verified.


Depressurisation and removal of cylinder valve

Before internal inspection the valve must be removed after depressurising and verifying that the valve is open. Cylinders containing breathing gases do not need special precautions for discharge except that high oxygen fraction gases should not be released in an enclosed space because of the fire hazard. If the valve is blocked or stuck closed it may be necessary to release the pressure by removing the burst disc or drilling into the valve body below the valve seat. These operations require care to avoid injury.


External visual inspection

Before inspection the cylinder must be clean and free of loose coatings, corrosion products and other materials which may obscure the surface. Foreign materials may be removed by brushing, controlled shot-blasting, water-jet cleaning chemical cleaning or other non-destructive methods. The method used must not remove a significant amount of cylinder material, and steel cylinders may not be heated above 300°C. Aluminium cylinders are even more restricted in the temperatures permitted, which are specified by the manufacturer. The cylinder is inspected for dents, cracks, gouges, cuts, bulges, laminations and excessive wear, heat damage, torch or electric arc burns, and corrosion damage. The cylinder is also checked for illegible, incorrect or unauthorised permanent stamp markings, and unauthorised additions or modifications. If the cylinder exceeds the rejection criteria for these items it is unsuitable for further service and will be made permanently unserviceable. Typical rejection criteria include: *Bulges *Burns *Cracks *Cuts *Dents *Defaced stamp markings *Gouges *Corrosion **General corrosion **Line corrosion **Pit corrosion (details to be added)


Internal visual inspection

Unless the cylinder walls are examined by ultrasonic methods, the interior must be visually inspected using sufficient illumination to identify any damage and defects, particularly corrosion. If the inner surface is not clearly visible it should be cleaned by approved method which does not remove a significant amount of wall material. Methods allowed include shot-blasting, water jet cleaning, flailing,
steam Steam is a substance containing water in the gas phase, and sometimes also an aerosol of liquid water droplets, or air. This may occur due to evaporation or due to boiling, where heat is applied until water reaches the enthalpy of vaporizatio ...
or hot water jet, rumbling and chemical cleaning . The cylinder must be internally inspected after cleaning. Typical rejection criteria include: *Cracks *Corrosion **General corrosion **Line corrosion **Pit corrosion *Damage to neck threads (details to be added)


Supplementary tests

When there is uncertainty whether a defect found during visual inspection meets the rejection criteria, additional tests may be applied, such as ultrasonic measurement of pitting wall thickness, or weight checks to establish total weight lost to corrosion. Hardness tests on aluminium cylinders are done on the cylindrical body and must avoid making deep impressions.


Cylinder neck inspection

While the valve is off, the threads of cylinder and valve must be checked to identify the thread type and condition. The threads of cylinder and valve must be of matching thread specification, clean and full form, undamaged and free of cracks, burrs and other imperfections. Tap marksMachining marks left by the thread cutter, particularly on taper threads, but also possible on parallel threads. are acceptable and should not be confused with cracks. Other neck surfaces will also be examined to be sure they are free from cracks. In some cases threads may be re-tapped, but if the threads are altered they must be checked with the appropriate thread gauges. The aluminium alloys used for diving cylinders are
6061 6061 ( Unified Numbering System (UNS) designation A96061) is a precipitation-hardened aluminium alloy, containing magnesium and silicon as its major alloying elements. Originally called "Alloy 61S", it was developed in 1935. It has good mechani ...
and 6351. 6351 alloy is subject to sustained load cracking and cylinders manufactured of this alloy should be periodically eddy current tested according to national legislation and manufacturer's recommendations. 6351 alloy has been superseded for new manufacture, but many old cylinders are still in service, and are still legal and considered safe if they pass the periodic hydrostatic, visual and eddy current tests required by regulation and as specified by the manufacturer. The number of cylinders that have failed catastrophically is in the order of 50 out of some 50 million manufactured. A larger number have failed the eddy current test and visual inspection of neck threads, or have leaked and been removed from service without harm to anyone.


Pressure test or ultrasonic examination

Ultrasonic inspection may be substituted for the pressure test, which is usually a hydrostatic test and may be either a proof test or a volumetric expansion test, depending on the cylinder design specification. Test pressure is specified in the stamp markings of the cylinder. The results of a correctly performed pressure test are final.


Inspection of valve

Valves that are to be reused must be inspected and maintained to ensure they remain fit for service. The recommended practice for valve inspection and maintenance includes inspection, and where applicable correction of threads, cleaning of components, replacement of excessively worn and damaged parts, packing and safety devices, lubrication as applicable with approved lubricants for the gas service, checks for correct operation and sealing at intended operating pressure. Checks may be done with the valve fitted to the cylinder after inspection and testing, or before the valve is fitted. Gauging of threads may be mandatory to ensure the integrity of parallel threads. If the gauge exceeds the maximum gauge limit for taper threads, re-tapping may be considered at the discretion of the competent person.


Final operations

The interior of the cylinder must be thoroughly dried immediately after cleaning or hydrostatic testing, and the interior inspected to ensure that there is no trace of free water or other contaminants. If the cylinder is repainted or plastic coated, the temperature must not exceed 300°C for steel cylinders, or the temperature specified by the manufacturer for aluminium cylinders. Before fitting the valve the thread type must be checked to ensure that a valve with matching thread specification is fitted. Fitting of valves should follow the procedures specified in ''ISO 13341 Transportable gas cylinders - Fitting of valves to gas cylinders.'' After the tests have been satisfactorily completed, a cylinder passing the test will be marked accordingly. Stamp marking will include the registered mark of the inspection facility and the date of testing (month and year). Records of a periodic inspection and test are made by the test station and kept available for inspection. These include: Identification of the cylinder: * name of current owner; * cylinder serial number; * mass of cylinder; * name of the cylinder manufacturer; * manufacturer's serial number; * cylinder design specification; * cylinder water capacity or size; * date of test during manufacture. Records of the tests and inspections: * type of inspections and tests done; * test pressure; * date of the test; * whether the cylinder passed or failed the inspections and tests (giving reasons for failure); * identification stamp mark of the test station; * identification of tester; * details of any repairs made.


Rejection and rendering cylinder unserviceable

If a cylinder fails inspection or testing and cannot be recovered, the owner must be notified before making the empty cylinder unserviceable by crushing, burning a hole in the shoulder, irregular cutting of the neck or cylinder or bursting using a safe method. If the owner does not give permission they become legally responsible for any consequences.


International variation

In South Africa test stations are accredited by the
South African National Accreditation System The South African National Accreditation System (SANAS) is the official accreditation body for South Africa. Founded in 1996, SANAS is headquartered in Pretoria, South Africa. SANAS accreditation certificates are a formal recognition by the G ...
(SANAS) under the approval of the
Department of Employment and Labour The Department of Employment and Labour is the department of the South African government responsible for matters related to employment, including industrial relations, job creation, unemployment insurance and occupational health and safety. ...
.


Notes


References

* CEN. EN 1089-2:2002 ''Transportable gas Cylinders, Part 2 - Precautionary labels'' Superseded by EN ISO 7225:2007. * CEN. EN 1089-3:2004 ''Transportable gas Cylinders, Part 3 - Colour coding'' Current standard.


Sources


External links

{{Underwater diving, divsaf Underwater breathing apparatus Pressure vessels Breathing gases